District Offices MnDOT District 7 - Mankato/Windom Metro District - St Paul/Minneapolis MnDOT District 8 - Marshall/Wilmar/Hutchinson MnDOT District 1 - Duluth/Virginia MnDOT District 4 - Detroit Lakes/Morris MnDOT District 2 - Bemidji/Crookston MnDOT District 3 - Baxter/St Cloud MnDOT District 6 - Rochester/Owatonna

Select a project by highway

Select a project by name

Hwys 1–9

Hwy 1

Hwy 1/169 Eagles Nest Lake Reconstruction

Description: Make safety improvements to Hwy 169 from Six Mile Lake Road to Bradach Road

Construction dates: Winter (January - March) 2017 to Summer 2018

Traffic impacts: Lane closures

More information: mndot.gov/d1/projects/Hwy169eagles/

Hwy 1—Kawishiwi River to Isabella

Description: Resurface pavement, replace culverts

Construction dates: Spring through fall 2017
Traffic impacts: Temporary lane closures

More information: mndot.gov/d1/projects/hwy1isabella/

Hwy 2

Hwy 2—Deer River

Description: Resurfacing, city utilities, sewer, pedestrian accessibility improvements

Construction dates: June 5 - August 2017

Traffic impacts:Lane closures, detour for east bound traffic

More information: mndot.gov/d2/projects/hwy2-deerriver

Hwy 2—Kennedy Bridge, East Grand Forks

Description: Replace bridge deck

Construction dates: Spring 2017 through fall 2018

Traffic impacts: Lane closures, detours

More information: mndot.gov/d2/projects/kennedybridge/

Hwy 2, Hwy 197—Bemidji

Description: Resurfacing, bridge repair

Construction dates: May 15 - September 2017

Traffic impacts: Lane closures, detours

More information: mndot.gov/d2/projects/bemidji-hwy2and197/

Hwy 3

Hwy 3 near Castle Rock Township

Description: Reconstruct Hwy 3 at the intersection of Co. Rd. 86/280th Street

Construction dates: July-October 2017

Traffic impacts: Road closure, detour

More information: mndot.gov/metro/projects/hwy3castlerock

Hwy 4

Hwy 4—St. James

Description: Reconstruct 1.6 miles of roadway, upgrade city utility infrastructure, enhance pedestrian accommodations

Construction dates: 2017-2018
Traffic impacts: No current traffic impacts

More information: mndot.gov/d7/projects/hwy4stjames/

Hwy 4—Cosmos

Description: Replace bridges and culverts

Construction dates: Spring-fall 2017

Traffic impacts: Detour

More information: mndot.gov/d8/projects/hwy4cosmos/

Sign up for Hwy 4 Cosmos project email updates

Hwy 4—Grove City

Description: Resurface road and improve culvert drainage

Construction dates: Late July-early October 2017

Traffic impacts: Lane closures, flagger and pilot car directing traffic

More information: mndot.gov/d8/projects/hwy4grovecity/

Sign up for Hwy 4 Grove City project email updates

Hwy 4—Fairfax

Description: Resurface road

Construction dates: Late July-early October 2017

Traffic impacts: Detour

More information: mndot.gov/d8/projects/hwy4fairfax/

Sign up for Hwy 4 Fairfax project email updates

Hwy 5

Hwy 5 Payne Ave in St. Paul

Description: Reconstruct intersection

Construction dates: July 2016 - January 2017

Traffic impacts: Off-peak lane closures

Hwy 7

Hwy 7 and Hwy 71 Roundabout -- Blomkest

Description: MnDOT is proposing to construct a roundabout at the intersection of Hwy 71 and Hwy 7 near the city of Blomkest.

Construction dates: Summer 2017

Traffic impacts: Detour

More information: mndot.gov/d8/projects/hwy7hwy71roundabout/

Sign up for Hwy 7/71 project email updates

Hwy 7 from Clara City to Blomkest

Description: Resurface highway

Construction dates: Spring-fall 2017

Traffic impacts: Detour

More information: mndot.gov/d8/projects/hwy7/

Sign up for Hwy 7 project email updates

Hwys 10–19

Hwy 10

Hwy 10—Elk River

Description: Description: Reconstruct the Hwy 10 bridge over Lake Orono, install a pedestrian trail, and resurface Hwy 10 from Joplin St to Xenia Ave in Elk River in Sherburne County.
Construction dates: Mid July 2017 - Fall 2018
Traffic impacts: Lane closures, lane shifts, plan for delays
More information: www.mndot.gov/d3/h10orono/

Sign up for Hwy 10 project email updates

Hwy 13

Hwy 13 in Savage and Burnsville

Description: Resurface road and extend turn lanes

Construction dates: Summer through fall 2017

Traffic impacts: Off-peak lane closures and delays

More information: mndot.gov/metro/projects/hwy13/

Sign up for Hwy 13 project email updates

Hwy 14

Hwy 14 and I-35 near Owatonna in Steele County

Description: Replace 10 bridges and reconstruct short segment of Hwy 14

Construction dates: April 2017-Fall 2018
Traffic impacts: Lane closures

More information: mndot.gov/d6/projects/steelecty-bridge/

Hwy 14—New Ulm to N. Mankato

Description: Replace New Ulm Minnesota River Bridge and Front Street Bridge, build interchange at Hwy 14/15/CR 21

Construction dates: Fall 2017 - fall 2019. In the meantime, MnDOT has taken steps to address the safety issues.

Traffic impacts: Lane closures

More information: mndot.gov/d7/projects/14newulmtonmankato/

Hwy 15

Hwy 15 in Fairmont

Description: Resurfacing, traffic signal improvements, pedestrian and accessibility improvements

Construction dates: Summer 2017

Traffic impacts: Lane closures, brief in-town detour

More information: mndot.gov/d7/projects/hwy15fairmont/

Hwy 18

Hwy 18 west of Garrison

Description: Restore the historical Kenney Lake roadside overlook along Hwy 18

Construction dates: May-July 2017

Traffic impacts: Roadside overlook to be closed

More information: mndot.gov/roadsides/historic/projects.html

Hwy 22

Hwy 22—Mapleton to Blue Earth County Road 15

Description: Reconstruct or mill-and-overlay deteriorating pavement segments. Replace Big Cobb River Bridge at Beauford

Construction dates: Spring 2017 - fall 2018

Traffic impacts: Detour

More information: mndot.gov/d7/projects/hwy22mapleton/

Hwy 22 Litchfield

Description: Resurfacing the road, replacing two culverts and constructing turn lanes

Construction dates: Spring-fall 2017

Traffic impacts: Detour

More information: mndot.gov/d8/projects/hwy22litchfield

Sign up for Hwy 22 project email updates

Hwy 22 Glencoe

Description: Bring pedestrian ramps, curb cuts and truncated domes up to ADA standards. Project led by city of Glencoe.

Construction dates: July-August 2017

Traffic impacts: Detour

More information: mndot.gov/d8/projects/hwy22glencoe

Hwys 20–29

Hwy 23

Hwy 23 from Becks Rd to the Jct of I-35 in Duluth

Description: Reconstruct 1.67 miles of Hwy 23, new bridge at Knowlton Creek, new traffic signals, improve accessibility, drainage

Construction dates: May 2016 to spring 2017

Traffic impacts: Lane closures

More information: mndot.gov/d1/projects/Hwy23grand/

Sign up for Hwy 23 project email updates

Hwy 23/Kandiyohi County Rd 5 near Willmar

Description: Construct bridge overpass of Hwy 23

Construction dates: Summer 2016–summer 2017
Traffic impacts: Delays, closures

More information: mndot.gov/d8/projects/hwy23kandi5/

Hwy 23, on Hwy 23 at the St. Louis River

Description: Resurfacing and bridge work

Construction Dates: This project will be completed in spring 2017

Traffic Impacts: None

More Information: mndot.gov/d1/projects/hwy23-carlton-pine-st-louis-county/

Hwy 24

Hwy 24 in Clearwater

Description: Replace the Mississippi River bridge

Construction dates: Aug. 15, 2015–June 2018

Traffic impacts: Minimal. Existing bridge will remain open while new one is constructed.

More information: mndot.gov/d3/hwy24/

Hwy 25

Hwy 25 Foley south

Description: Reconstruct the road surface and improve drainage from Glen St in Foley south to Hwy 95 in Benton County. 

Construction dates: Late-April – June 2017

Traffic impacts: Close and detour via Hwy 95 and Hwy 23. Plan for delays.

More information: mndot.gov/d3/2017/h25/foleysouth/

Hwy 25 at 7th St in Monticello

Description: The city of Monticello to make intersection improvements at Hwy 25 and 7th St. Includes new turn lanes, pedestrian accesses and landscaping.

Construction dates: April-July 2017

Traffic impacts: Periodic nighttime lane closures on Hwy 25. Drivers will be able to cross the intersection at all times.

More information: mndot.gov/d3/monti/

Hwy 25 Foley north to Genola

Description: Resurface and improve 27 miles of Hwy 25 from Hwy 23 in Foley to 123rd St south of Genola, includes new sidewalks in Buckman. 

Construction dates: Mid-July – Oct 2017

Traffic impacts: Lane closures, flaggers, pilot car.

More information: mndot.gov/d3/2017/h25/foleytogenola/

Hwy 27

Hwy 27 bridge over I-94, west of Osakis

Description: Redeck and upgrade the Hwy 27  bridge over I-94 at Douglas County Rd 3, west of Osakis.

Construction dates: Late-March to early-July

Traffic impacts: Hwy 27 bridge closed. Access detours, follow signs through Alexandria, West Union or Osakis. Periodic single-lane closures on I-94 at bridge.

More information: www.mndot.gov/d3/2017/osakis/

Hwy 27, Hwy 71 - Long Prairie

Description: Resurface Hwy 27 and Hwy 71, improve pedestrian accesses, and upgrade the signal system at Hwy 71/Todd County Rd 38 in Long Prairie.
Construction dates: Mid July – Sept 2017
Traffic impacts: Lane closures, possible flaggers controlling traffic. Local access detours, follow detour signs.
More information: mndot.gov/d3/2017/longprairie/

Hwys 27, 73 and 289–Moose Lake Area

Description: Roundabout. Resurface, add turn lanes, accessibility improvements

Construction dates: Spring 2017

Traffic impacts: Lane closures

More information: mndot.gov/d1/projects/Moose-Lake-Area-Project/

Hwy 29

Hwy 29 – Montevideo

Description: Replace bridge over TC & W railroad

Construction dates: Summer 2017

Traffic impacts: Detour

More information: mndot.gov/d8/projects/hwy29montevideo/

Hwys 30-39

Hwy 30

Hwy 30 Lake Wilson to Slayton

Description: Resurfacing and pedestrian improvements to meet ADA standards

Construction dates: Summer 2017

Traffic impacts: Lane closures

More information: mndot.gov/d8/projects/hwy30lakewilsontoslayton/

Hwy 30 Pipestone to South Dakota border

Description: Resurfacing

Construction dates: Mid-July to late August 2017

Traffic impacts: Lane closures and flagger with pilot car

More information: mndot.gov/d8/projects/hwy30pipestone/

Sign up for Hwy 30 project email updates

I-35

I-35 and Hwy 14 near Owatonna in Steele County

Description: Replace 10 bridges and reconstruct short segment of Hwy 14

Construction dates: April 2017-Fall 2018
Traffic impacts: Lane closures

More information: mndot.gov/d6/projects/steelecty-bridge/

I-35W/I-35E and I-35 from Lino Lakes to Forest Lake

Description: Project includes resurfacing the road and replacing bridges

Construction dates: July 2017 - 2019

Traffic impacts: Lane closures

More information: mndot.gov/metro/projects/35linolakes

Sign up for I-35W/I-35E and I-35 project email updates

I-35 Willow River

Description: Resurfacing and drainage work

Construction dates: May - September 2017

Traffic impacts: Ramp closures at Willow River (CSAH 43) and Sturgeon Lake (CSAH 46)

More information: mndot.gov/d1/projects/i35willowriver

I-35E

I-35E University Ave to Maryland Ave in Saint Paul

Description: Replace existing partial interchange at Pennsylvania Ave with full interchange at Cayuga St, construct frontage road, replace bridges and connect Gateway Trail to Saint Paul trail systems

Construction dates: April 2013-Spring 2017

Traffic impacts: Lane and ramp closures, local road closures, and detours

More information: mndot.gov/metro/projects/35estpaul

Sign up for I-35E project email updates

I-35E bridge at Shepard Rd in St. Paul

Description: Repair and resurface bridge

Construction dates: Mid-May through October 2017

Traffic impacts: Delays, closures

More information: mndot.gov/metro/projects/i35ebridges

Sign up for Hwy I-35E bridge project email updates

I-35E, Hwy 96, and Goose Lake Road between Little Canada and Lino Lakes

Description: Resurface road, work on area bridges and construct pedestrian trail and MnPASS Lanes

Construction dates: Summer 2015 through spring 2017

Traffic impacts: Weekend road closures, detours, lane and ramp closures

More information: mndot.gov/metro/projects/i35vadnaisheights

Sign up for I-35E project email updates

I-35W

I-35W/Lake Street in Minneapolis

Description: Improve transit and regional access, reconstruct bridges and pavement
Construction dates: Summer 2017 through fall 2021
Traffic impacts: Lane and ramp closures
More information:
mndot.gov/metro/projects/i35wminneapolis/

Sign up for I-35W project email updates

I-35W/I-94 drainage tunnels in Minneapolis

Description: Repair drain tunnels, construct new tunnel access shaft

Construction dates: Fall 2014-Winter 2016/2017
Traffic impacts: Delays, lane closures at staging area

More information: mndot.gov/metro/projects/stevensavenuempls

I-35W at County Rd 42 in Burnsville

Description: Extend left turn lane, replace bridge joints, resurface bridge

Construction dates: April-June 2017

Traffic impacts: Lane closures
More information: https://www.co.dakota.mn.us/Transportation/PlannedConstruction/CR42-I35WBurnsville/Pages/default.aspx

Hwy 36

Hwy 36 Stillwater Lift Bridge

Description: Convert Stillwater Lift Bridge to a pedestrian bridge. Vehicle traffic will be moved to the St. Croix Crossing
Construction dates: Summer/fall 2017 to fall 2018
Traffic impacts: Closures, detours
More information: mndot.gov/metro/projects/liftbridge/

Sign up for Hwy 36 project email updates

Hwy 36 to Como Ave. along Hwy 51/Snelling Ave.

Description: Concrete repair work, adding turn lanes and safety improvements
Construction dates: April through early-October 2017
Traffic impacts: Lane and ramp closures
More information: mndot.gov/metro/projects/hwy51snellingandhwy36

Sign up for Hwy 36 project email updates

Hwy 36, 95 St. Croix River Crossing

Description: Reconstruct road, frontage roads and intersections, including interchange at Hwy 95, construct foundations in river for the new bridge, construct St. Croix Crossing Bridge and on and off ramps, install state entry signs, overweight enforcement pull off pad, weigh in motion system and landscaping.

Construction dates: May 2014-fall 2017

Traffic impacts: Lane closures, shoulder closures, river channel restrictions, noise impacts

More information: mndot.gov/stcroixcrossing/

Sign up for St. Croix Crossing project email updates

Hwys 40-59

Hwy 43

Hwy 43 in Winona

Description: Repair current bridge and construct new bridge across Mississippi River

Construction dates: July 2014-fall 2019

Traffic impacts: Minimal — short-term local road detour

More information: mndot.gov/winonabridge/

Sign up for Hwy 43 project email updates

Hwy 47

Hwy 47, Hwy 65 in Minneapolis (University & Central Avenues)

Description: Reconstruct the signal systems and sidewalk ramps to comply with ADA requirements at nine intersections on Hwy 47/University Ave. and Hwy 65/Central Ave. (14 total between 2016 and 2017 project work)

Construction dates: July-November 2016; late May to Fall 2017
Traffic impacts: Off-peak lane closures, local road closures, sidewalk closures

More information: mndot.gov/metro/projects/hwy47andhwy65

Hwy 50

Hwy 50 between Hwy 3 in Farmington and Hwy 52 in Hampton

Description: Resurfacing, renew signing, upgrade ADA crossings, modify intersections and add right turn lanes

Construction dates: June-fall 2017

Traffic impacts: Lane closures, detour

More information: mndot.gov/metro/projects/hwy50farmington/

Hwy 51

Hwy 51/Snelling Ave from Como Ave to Hwy 36

Description: Concrete repair work, adding turn lanes and safety improvements

Construction dates: April through early-October 2017

Traffic impacts: Lane and ramp closures

More information: mndot.gov/metro/projects/hwy51snellingandhwy36

Sign up for Hwy 51 project email updates

Hwy 52

Hwy 52 Coates to Cannon Falls

Description: Install Reduced Conflict Intersections

Construction dates: Summer-fall 2017

Traffic impacts: Lane closures

More information: mndot.gov/metro/projects/hwy52coates/

Sign up for Hwy 52 project email updates

Hwy 53

Hwy 53 between Eveleth and Virginia in St. Louis County

Description: Relocate this highway.

Construction dates: Fall 2015 - fall 2017
Traffic impacts: Minimal

More information: mndot.gov/d1/projects/hwy53relocation

Sign up for Hwy 53 project email updates

Hwy 58

Hwy 58/Hwy 52 interchange in Zumbrota

Description: Bridge replacement and roadway approach improvement

Construction dates: Summer 2017 - summer 2018

Traffic impacts: Lane closures

More information: mndot.gov/d6/projects/hwy58-bridge

Hwy 59

Hwy 59 roundabout south of Detroit Lakes

Description: Construct a roundabout at Hwy 59 and Becker County Rd 22

Construction dates: Spring/summer 2017

Traffic impacts: Lane closures

More information: mndot.gov/d4/projects/hwy59roundabout

Hwy 59 Winger to Callaway

Description: Resurfacing, culvert replacement; turn lane, trail, and pedestrian accessibility improvements in Mahnomen

Construction dates: May 15 - September 2017

Traffic impacts: Lane closures

More information: mndot.gov/d2/projects/hwy59-winger-callaway

Hwy 60

Hwy 60 Windom to Mountain Lake

Description: Complete four-lane expansion of Hwy 60 from Windom to St. James

Construction dates: Spring 2017-2018

Traffic impacts: Lane closures

More information: mndot.gov/d7/projects/hwy60stjames

Hwy 65

Hwy 47, Hwy 65 in Minneapolis (University & Central Avenues)

Description: Reconstruct the signal systems and sidewalk ramps to comply with ADA requirements at nine intersections on Hwy 47/University Ave. and Hwy 65/Central Ave. (14 total between 2016 and 2017 project work)

Construction dates: July-November 2016; late May to Fall 2017
Traffic impacts: Off-peak lane closures, local road closures, sidewalk closures

More information: mndot.gov/metro/projects/hwy47andhwy65

Hwy 63

Hwy 63 Red Wing Bridges

Description: Rehabilitate existing bridges, identify a preferred alternative for a bridge crossing between Red Wing, Minn. and Wisconsin

Status: Construction begins 2017.

Contact: Mike Dougherty

More information: mndot.gov/d6/projects/redwing-bridge/

Hwy 67

Hwy 67 Morgan

Description: Resurface road. Project led by City of Morgan.

Construction dates: Late summer 2017
Traffic impacts: Lane closures, pilot car and flagger

More information: mndot.gov/d8/projects/hwy67morgan

Hwy 67 Echo

Description: Resurface road

Construction dates: Early October-early November 2017
Traffic impacts: Slow traffic

More information: mndot.gov/d8/projects/hwy67echo

Hwy 68

Hwy 68 Marshall

Description: Construct left turn/acceleration lane

Construction dates: Late April to early May 2017
Traffic impacts: Slow traffic

More information: mndot.gov/metro/projects/hwy68

Hwys 60-79

Hwy 71

Hwy 71 and Hwy 7 Roundabout - Blomkest

Description: MnDOT is proposing to construct a roundabout at the intersection of Hwy 71 and Hwy 7 near the city of Blomkest.

Construction dates: Summer 2017

Traffic impacts: Detour

More information: mndot.gov/d8/projects/hwy7hwy71roundabout/

Hwy 71 - Elrosa

Description: Reconstruct road, replace storm sewers and improve sidewalks in Elrosa, in Stearns County

Construction dates: April - early Aug 2017

Traffic impacts: Lane closures, possible flaggers, road closures, detours (May - early Aug.)

More information: mndot.gov/d3/2017/elrosa

Hwy 71, Hwy 27 - Long Prairie

Description: Resurface Hwy 71 and Hwy 27, improve pedestrian accesses, and upgrade the signal system at Hwy 71/Todd County Rd 38 in Long Prairie.
Construction dates: Mid July – Sept 2017
Traffic impacts: Lane closures, possible flaggers controlling traffic. Local access detours, follow detour signs.
More information: mndot.gov/d3/2017/longprairie/

Hwy 73

Hwys 27, 73 and 289–Moose Lake Area

Description: Construct roundabout. Resurface, add turn lanes, accessibility improvements

Construction dates: Spring 2017

Traffic impacts: Lane closures

More information: mndot.gov/d1/projects/Moose-Lake-Area-Project/

Hwy 73 / County Rd 5 in Chisholm

Description: Construct roundabout

Construction dates: Summer-fall 2017

Traffic impacts: Detour

More information: mndot.gov/d1/projects/hwy73chisholm/

Hwy 73 in Kettle River

Description: Replace bridge over west branch of the Kettle River

Construction dates: June 19 to Sept. 15, 2017

Traffic impacts: Detour

More information: mndot.gov/d1/projects/hwy73kettleriver/

Hwy 77

Hwy 77 at Hwy 13 to Diffley Rd in Eagan

Description: Construct Cedar Grove Transit Station (Red Line BRT) in the median and skyway over Hwy 77 to Park and Ride at Nicols Rd

Construction dates: May 2016 - June 2017

Traffic impacts: Lane, shoulder and ramp closures with detours
More information: http://metrocouncil.org/cedargrovestationimprovements

Contact: Claudius Toussaint (Metro Transit)

Hwys 80-99

I-90

I-90 Corridor Preservation

Description: Pavement restoration and bridge rehab

Construction dates: 2014-2018

More information: mndot.gov/d7/projects/I90preserve/

Sign up for I-90 project email updates

I-94 in Twin Cities Metro

I-94 – Minneapolis to Brooklyn Center

Description: Resurface road, repair bridges on or over I-94, reconstruct westbound I-94 bridge deck over Hwy 252, and repair Lowry and Portland Avenue tunnels.

Construction dates: Spring 2017 through summer 2018

Traffic impacts: Closures

More Information: mndot.gov/metro/projects/i94brooklyncntr

Sign up for I-94 project email updates

I-94, I-35W drainage tunnels in Minneapolis

Description: Repair drain tunnels, construct new tunnel access shaft

Construction dates: Fall 2014-Winter 2016/2017
Traffic impacts: Delays, lane closures at staging area

More information: mndot.gov/metro/projects/stevensavenuempls

I-94 – St. Paul to Maplewood

Description: Resurface road, construct auxiliary lane and emergency pull-offs, build noisewall and replace part of an existing noisewall, repair bridges.

Construction dates: Spring 2016 - Fall 2017

Traffic impacts: Lane closures, delays

More information: mndot.gov/metro/projects/i94stpaul

Sign up for I-94 project email updates

Hwy 95

Hwy 95, 36 St. Croix River Crossing

Description: Reconstruct road, frontage roads and intersections, including interchange at Hwy 95, construct foundations in river for the new bridge, construct St. Croix Crossing Bridge and on and off ramps, install state entry signs, overweight enforcement pull off pad, weigh in motion system and landscaping.

Construction dates: May 2014-2017

Traffic impacts: Lane closures, shoulder closures, river channel restrictions, noise impacts

More information: mndot.gov/stcroixcrossing/

Sign up for St. Croix Crossing project email updates

Hwy 95/Manning Avenue Safety Improvement projects in Washington Co

Description: Widening shoulders, resurface road, add turn lanes and update drainage.

Construction dates: Spring 2017 through late-fall 2019

Traffic impacts: Closures, detour

More information: mndot.gov/metro/projects/hwy95safetyimprovements

Sign up for Hwy 95 project email updates

Hwy 95 - Princeton

Description: The city of Princeton and Mille Lacs County to construct a new roundabout at Highway 95 and 21st Ave N (County Road 157)

Construction dates: Mid July – Oct 2017

Traffic impacts: Hwy 95 to close and detour through Princeton

More information: mndot.gov/d3/2017/princeton/

Hwy 96

Hwy 96, I-35E and Goose Lake Road between Little Canada and Lino Lakes

Description: Resurface road, work on area bridges and construct pedestrian trail and MnPASS Lanes

Construction dates: Summer 2015 through fall 2016

Traffic impacts: Weekend road closures, detours, lane and ramp closures

More information: mndot.gov/metro/projects/i35vadnaisheights

Sign up for Hwy 96 project email updates

Hwy 97

Hwy 97/11th Street - Forest Lake

Description: Convert an eastbound bypass lane on Hwy 97 into a dedicated left turn lane

Construction dates: Summer-fall 2017
Traffic impacts: Lane closures

More information: mndot.gov/metro/projects/hwy97forestlake/

Hwy 99

Hwy 99 over Minnesota River at Saint Peter

Description: Preserve historic bridge

Construction dates: Summer 2017

Traffic impacts: Detour

More information: mndot.gov/d7/projects/hwy99stpeter/

Hwys 100-199

Hwy 110

Hwy 110 in Inver Grove Heights, Mendota Heights, Sunfish Lake, West St. Paul

Description: Modify access to Dakota Drive, upgrade signing, update pedestrian crossings to meet current ADA standards

Construction dates: Spring-fall 2017
Traffic impacts: Lane closures

More information: mndot.gov/metro/projects/hwy110mendotaheights/

Sign up for Hwy 110 project email updates

Hwy 169 in the Twin Cities Metro

Hwy 169 between Golden Valley and Edina

Description: Replacing driving surface of bridge over Nine Mile Creek and reconstructing pavement.

Construction dates: January through October 2017

More information: mndot.gov/metro/projects/hwy169hopkins/

Sign up for Hwy 169 project email updates

Hwy 169 in Champlin

Description: Replace bridges on Hwy 169 at Elm Creek

Construction dates: Fall 2017 through October 2017
Traffic impacts: Lane closures controlled by signals or flaggers

More information: mndot.gov/metro/projects/hwy169champlin

Sign up for Hwy 169 project email updates

Hwy 169 in Greater Minnesota

Hwy 169/Hwy 37 intersection in Hibbing

Description: Construct roundabout

Construction dates: Spring-fall 2017
Traffic impacts: Lane closures
More information: mndot.gov/d1/projects/Hwy-169-Hwy-37-Roundabout/

Hwy 169—Aitkin

Description: Construct a new roundabout at the intersection of Hwy 169 and Red Oak/Southgate Drive in the city of Aitkin.

Construction dates: May to mid-Oct 2017
Traffic impacts: Hwy 169 open with lane shifts, narrow lanes and reduced speeds.

More information: mndot.gov/d3/aitkin/

Hwy 169 south of Aitkin

Description: Restore the historic Pine-Hickory Lakes Roadside Parking Area

Construction dates: Aug. - Oct. 2017
Traffic impacts: Parking area to be closed.

More information: mndot.gov/roadsides/historic/projects.html

Hwy 169/1 Cross-Range Expressway

Description: This project will expand Hwy 169 from two to four lanes from the east end of the Bovey Bypass, east 1.55 miles through Taconite.

Construction Dates: September 12, 2016-Fall 2017

Traffic Impacts: Lane closures

More information: mndot.gov/d1/projects/hwy169-cross-range/

Hwy 1/169 Eagles Nest Lake Reconstruction

Description: Make safety improvements to Hwy 169 from Six Mile Lake Road to Bradach Road

Construction Dates: Winter (January-March) 2017-summer 2018

Traffic Impacts: Lane closures

More information: mndot.gov/d1/projects/Hwy169eagles/

Hwy 197

Hwy 197, Hwy 2—Bemidji

Description: Resurfacing, bridge repair

Construction dates: May 15 - September 2017

Traffic impacts: Lane closures, detours

More information: mndot.gov/d2/projects/bemidji-hwy2and197/

Hwys 200-299

Hwy 210

Hwy 210 County Rd 151 (Jay Cooke Rd) to Hwy 23 in Jay Cooke State Park

Description: Resurface damaged sections, improve drainage, flatten slopes

Construction dates: May 2015-October 2017

Traffic impacts: Road closure

More information: mndot.gov/d1/projects/Hwy210future/

Hwy 238

Hwy 238 Upsala to Albany

Description: Reconstruct the road surface, pave shoulders and improve drainage, from Morrison County Road 21 in Upsala to Stearns County Road 10 in Albany
Construction dates: May – mid-Sept 2017
Traffic impacts: Close road segments and detour
More information: mndot.gov/d3/2017/h238/

Hwy 277

Hwy 277 Gluek

Description: Replace bridge
Construction dates: Late July – early September 2017
Traffic impacts: Detour
More information: mndot.gov/d8/projects/hwy277

Hwy 289

Hwys 27, 73 and 289–Moose Lake Area

Description: Roundabout. Resurface, add turn lanes, accessibility improvements

Status: Work begins spring 2017

Contact: Roberta Dwyer

More information: mndot.gov/d1/projects/Moose-Lake-Area-Project/

Hwys 300-694

Hwy 371

Hwy 371 Nisswa, Pequot Lakes, Jenkins

Description: Expand to four lanes and improve access along the corridor, includes the Paul Bunyan Trail and new interchange at County Rd 11 in Pequot Lakes.

Construction dates: January 2016-fall 2017

Traffic impacts: Closures, delays, detours

More information: mndot.gov/d3/hwy371/

Sign up for Hwy 371 project email updates

Hwy 371B —South Sixth Street Brainerd

Description: Reconstruct South Sixth Street in Brainerd; includes city sidewalks, underground utilities and infrastructure and signal systems between Hwy 210 and St. Joseph St
Construction dates:  Fall 2017–Fall 2018
Traffic impacts: Prep work Fall 2017- Winter 2018 - Periodic lane or shoulder closures. Reconstruct Spring-Fall 2018 – Close Hwy 371 in segments and detour
More information: mndot.gov/d3/brd/

Hwy 610

Hwy 610 in Maple Grove

Description: Project extending Hwy 610 between Elm Creek Boulevard and I-94
Construction dates: September 2015 through spring 2017
Traffic impacts: Road and lane closures
More information: mndot.gov/metro/projects/610west

Sign up for Hwy 610 project email updates

I-694

I-694 between Rice Street in Shoreview and Lexington Avenue in Arden Hills

Description: Reconstruct I-694, add third general purpose lane and rebuild interstate ramps

Construction dates: May 2016-November 2017

Traffic impacts: Closures, delays

More information: mndot.gov/enhance694

Sign up for I-694 project email updates