Minnesota Department of Transportation

511 Travel Info

I-35W and 86th Street Bridge

Bloomington

Project complete

Project work is largely complete. Some additional work is required this spring.

Upcoming

Details on wrap-up project work will be provided as they become available.

About the 2017 bridge repairs

The 86th St. bridge has been hit by vehicles carrying high loads several times. The decision was made to replace the bridge because of substantial damage and the need to increase the vertical clearance.

Summary of work

  • Replaced bridge at 86th St. over Interstate 35W in Bloomington